Rack & In-Row Cooling
Rack and in-row cooling, rack-mount units, airflow management, and fans — through authorized distribution, sized to the heat the rack actually makes.
What We Source
- Rack and in-row cooling units
- Rack-mount and ceiling-mount cooling
- Blanking panels, brush strips, and airflow management
- Fan trays, chassis fans, and replacement fans
- Temperature and humidity monitoring
- Liquid-cooling CDUs, quoted on request
Typical Requests
A rack that runs hot
Cooling sized against the load in the rack rather than against the size of the room.
Airflow before hardware
Blanking panels and containment first — the cheapest cooling is the air you stop recirculating.
Replacement fans and trays
Fan trays and chassis fans matched to the switch, server, or shelf they came out of.
Airflow & Sizing
Cooling is sized against the load in the rack, not the floor area of the room — and the first fix is almost never a cooling unit.
Airflow direction
Switches come in front-to-back and back-to-front variants, and so do their power supplies and fan trays. Get it wrong and you're exhausting hot air into your cold aisle. The chassis, the PSUs, and the fans all have to agree — a correct switch with mismatched fan trays is still wrong. Tell us which way your aisle runs.
Sizing to the load
A rack's cooling requirement is the power it draws, not the number of units in it. Total the draw at the PDU and size against that figure — a unit chosen from rack height alone is either short of the load or paid for twice. Tell us the draw and the inlet temperature you need to hold and we'll size against both.
Liquid cooling
Coolant distribution units and the loops that feed them are quoted on request rather than listed, because the specification depends on the facility rather than on the rack: supply temperature, flow rate, and what the building can actually give you. Send the facility detail and we'll quote against it.
FAQ
Do you hold cooling units in stock?
Rack-mount units, fans and airflow management come through authorized distribution and are quoted against current distribution stock. Liquid-cooling CDUs are quoted on request, because the specification depends on the facility.
Can you match a fan tray to my switch?
Yes. Fan trays are direction-specific and model-specific — a tray that physically seats can still blow the wrong way. Send the chassis model and which way your aisle runs.
Do you quote cooling with the hardware?
Yes. If a build adds draw to a rack, the cooling and the airflow management are quoted on the same line as the hardware that caused it.
Need a rack cooled?
Tell us the draw and the inlet temperature. We respond within one business day.
Installed and configured
Blanking panels, airflow management and rack fans fitted with the rack; anything that needs a mechanical contractor is scoped on the quote.